| # 21 C PROCESS CONER - TYPE MAGAZINE | |||||||
| HOW TO USE LOT CHANGE MODE ( F 10 IN THE " VOS " ) | |||||||
| PROCEDURE | |||||||
| 1 | )Bring F 10 screen in the VOS | ||||||
| 2 | ) Insert key and keep in set position | ||||||
| Bring the cursor to the group requires LOT CHANGE when even spindles are running in that group. | |||||||
| 4 | Press " MODE - 1 " from the right top corner & press " ENTER " | ||||||
| 5 | When the set length is reached in the spindles of that group, " U1 " is displayed in the seven segment display | ||||||
| of the winding unit and winding unit stops. | |||||||
| 6 | In this condition, AD engages ( in the spindle where full doff signal available ), yarn pick-up cutter picks up | ||||||
| the yarn from re-tie pipe and releases the yarn from cutter before the cutter cylinder goes up. By this way | |||||||
| the yarn end from spg bobbin on the peg is taken away from the re-tie pipe as well from gate tensor. | |||||||
| AD just removes the full package from cradle and places new empty tube of old LOT in the cradle. | |||||||
| It will not restart the drum to start winding. | |||||||
| 7 | When the above action is completed in all the spindles of the group, turn " OFF " the lot change mode | ||||||
| in F 10 screen of VOS. | |||||||
| 8 | Remove all the spinning bobbin of old LOT from the Magazine pockets except from the peg. | ||||||
| 9 | After this, one time turn "OFF" and then "ON" the yellow lamp button. By this, the old lot spinning bobbin on | ||||||
| the peg will be ejected automatically. | |||||||
| 10 | After all old lot bobbins are ejected as informed in step # 9, feed new LOT spinning bobbins to the | ||||||
| magazine pocket for the particular group. | |||||||
| 11 | Place new lot empty take-up tube on the stocker for the particular group | ||||||
| 12 | After completing step # 10 & 11, push the BLUE colour reset button " ONCE " only. AD will restart the | ||||||
| spindles one by one. | |||||||
| This ends the LOT CHANGE procedure. | |||||||
Saturday, August 31, 2019
MURTA 21C LOT CHANGE PROCEDURE
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment