Saturday, August 24, 2019

UNILAP CALCULATIONS



UNI LAP  E 5/3  GEARING  CALCULATION
40 CHR
HANK DELIVERED        =     0.130
LAP WEIGHT IN Gms/metre    =     68
MOTOR SPEED           =    2840 r.pm
MOTOR PULLEY DIA      =    110 mm
MACHINE PULLEY DIA    =    338 mm
MICRO DUST FAN MOTOR SPEED     =          2880
MICRO DUST FAN MOTOR PULLY      =          140
MICRO DUST FAN PULLLY      =          165      
LAP ROLLER CHANGE WHEEL (A)   =    83 T
LAP ROLLER CHANGE WHEEL (B)   =    91 T
CALENDER LAP ROLLER CHANGE WHEEL ( C ) =   57  T
sCALENDER LAP ROLLER CHANGE WHEEL ( D ) =   95 T
DRAFT CHANGE WHEEL (E)     =   40 T
DRAFT CHANGE WHEEL (F)     =   56 T
DRAFT CHANGE WHEEL (G)     =   63 T
DRAFT CHANGE WHEEL (H)     =   61 T
BREAK DRAFT CHANGE WHEEL        (J)  =    46T
BREAK DRAFT CHANGE WHEEL        (K)  =    40T
DRAFT WHEEL (L)    = 25T
DRAFT WHEEL (M)    =            21T
TABLE CALENDER CHANGE GEAR    =          71T
FEED CHANGE GEAR =          61T
DELY CHANGE GEAR =          67T
NO.OF ENDS UP                     =          22
MAIN DRAFT SETTING            =          42mm
DRAFT ROLLER SETTING       =          42/44/46
TENSION %                 =          0.1506
IN FEED ROLLER DIA  =          57 mm
4/4 DRAFTING ARRANGEMENT WITH BOTTOM ROLLER DIA’S OF
d1 = d2 = d3 = d4 =       32 mm
FIRST or  DELIVERY CALENDER ROLLER DIA           =          154.8mm
SECOND CALENDER ROLLER DIA     =          148.2mm
III rd CALENDER ROLLER DIA =          151.8mm
IV th CALENDER ROLLER DIA =          145.2mm
LAP ROLLER DIA                     =          700MM
TABLE CSAL.ROLL DIA            =          70mm
MICRO DUST FAN SPEED      =          2880*140/165
                                                            =          2443.63 R.P.M
LAP ROLL SPEED        =          2840*110/338*54/D*C/92*54/92*92/B*A/83*23/98
                                                =          45.332 R.P.M
SURFACE SPEED OF LAP ROLL         =          LAP.R.S * DIA*3.14/1000
                                                                        =          99.639883 m/min
FIRST CALEDER ROLL SPEED                       =          2840 * 110/338*23/105
                                                                        =          202.4570 R.P.M
SURFACE SPEED OF 1st CAL.ROLL     =          SPEED*DIA*3.14/1000
                                                                        =          98.4086 m/min
SPEED OF SECOND CAL.ROLL                       =          2840 *110/338* 23/105 * 30/29
                                                                        =          209.4382 R.P.M
SURFACE SPEED OF 2nd CAL.ROLL    =          SPEED * DIA*3.14/1000
                                                                        =          97.461678 m/min
SPEED OF THIRD CAL.ROLL               =          2840 *110/338* 23/105 * 30/30
                                                                        =          202.4570 R.P.M
SURFACE SPEED OF THIRD CAL.ROLL         =          SPEED * DIA * 3.14
                                                                                    =          96.501532 m/min
 SPEED OF FORTH CAL ROLL SPEED            =          2840 *110/338* 23/105 * 30/29

                                                                                    =    209.4382   R.P.M
SURFACE SPEED OF FORTH CAL ROLL SPEED        =          SPEED * DIA * 3.14/1000
                                                                                                =          95.4887 m/min
SPEED OF TABLE CAL.ROLLER                     
=          2840 *110/338* 31/29 * 28/28 * 31/ T.CAL.C.G * 27/24 * 15/17
=          428.2093 R.P.M
SURFACE SPEED OF T.CAL.ROLL                  =  SPEED * DIA * 3.14
                                                                                    =          94.1204 m/min
SPEED OF DRAW BOX FRONT ROLL  =          924.26035 * 31/29 * 28/28*31/TABLE.CAL   
                                    CHANGE GEAR * DELIVERY CHANGE GEAR/31
                                                                 =     932.3402 R.P.M
SURFACE SPEED OF FRONT ROLL    =          SPEED * DIA * 3.14/1000
                                                                        =          93.6815 m/min
SPEED OF SECOND ROLL      =          FRONT ROLL SPEED*E/F*G/H*K/J*37/24*M/L
                                                            =          774.5134 R.P.M
SURFACE SPEED OF IInd ROLL          =          SPEED * DIA * 3.14/1000
                                                                        =          77.8231 M/ min
SPEED OF THIRD ROLL                      =          924.26035 * 31/29 * 28/28*31/TABLE.CAL   
CHANGE GEAR * DELIVERY CHANGE GEAR/31* E/F*G/H*K/J*37/31
                                                            =          713.8375 R.P.M
SURFACE SPEED OF III rd ROLL         =          SPEED * DIA * 3.14/1000
            =          71.7263 m/min
SPEED of IV th ROLL               =          924.26035 * 31/29 * 28/28*31/TABLE.CAL   
CHANGE GEAR * DELIVERY CHANGE GEAR/31* E/F*G/H
                                                            =          687.7919 R.P.M
SURFACE SPEED OF IV th ROLL        =          SPEED * DIA * 3.14/1000
=          69.1093 m/min
 SPEED            OF INFEED ROLLER   
=          924.26035 * 31/29 * 28/28*31/TABLE.CAL.CHA.WHEEL * DELIVERY CHANGE
GEAR/31* E/F*G/H*18/FEED CHANGE GEAR *36/19
            =          384.54631 R.P.M
SURFACE SPEED OF IN FEED ROLL  =          SPEED *DIA*3.14/1000
                                                                        =          68.82609 m/min
                                                                                                SURFACE SPEED OF IV th CAL.ROLL
DRAFT IN BET.IV th CAL.ROLL &                     =    SURFACE SPEED OF TABLE CAL.ROLL
       TABLE CAL ROLL
                                                95.4887
                                    =          94.1204             =          1.0145377
                                                                                                SURFACE SPEED OF TABLE CAL.ROLL
DRAFT IN BET.TABLE CAL.ROLL &                 =            SURFACE SPEED OF FRONT ROLL
    DRAW BOX FRONT ROLL
                                                94.1204
                                    =          93.6815 =          1.000468
                                                                                       SURFACE SPEED OF IV th CAL.ROLL
DRAFT IN BET.IV th CAL.ROLL &                     =          SURFACE SPEED OF FRONT ROLL
 DRAW BOX FRONT ROLL
                                                95.4887
                                    =          93.6815=           1.0192908
                                                                                    SURFACE SPEED OF FRONT ROLL
DRAFT IN BET.FRONT ROLL &            =          SURFACE SPEED OF IInd roll
  SECOND ROLL                                                          93.6815
                                                                        =          77.8231=           1.2037
                                                                                    SURFACE SPEED OF IInd roll
DRAFT IN BET.second. ROLL &            =          SURFACE SPEED OF III rd roll
  third roll
                                                77.8231
                                    =          71.7263=           1.0850009
                                                                                    SURFACE SPEED OF III rd roll
DRAFT IN BET.III rd ROLL &    =    SURFACE SPEED OF IV th roll
 IV th roll                       71.7263
                                    =          69.1093=           1.0378675
                                                                        SURFACE SPEED OF IV th roll
DRAFT IN BET.Iv th ROLL &     =          SURFACE SPEED OF INFEED roll
 INFEED ROLL                                     69.1093
                                                            =          68.82609=         1.0041148
TOTAL DRAFT IN DRAW BOX=            MAIN DRAFT X INTERMEDIATE DRFT X BREAK DRAFT
                                                   =       1.2037 X 1.0850009 X 1.0378675
                                                   =    1.355471
                                                FEED SLIVER WEIGHT IN gms/m    x  no.of doublings
TOTAL DRAFT   =        DELIVERED SLIVER EWIGHT IN gm/m
                                                4.5426679         x 22  =        68
                                    =          1.4696858
                                                            ACTUAL LAP SHEET WEIGHTX PERSENTY TOTAL DRAFT
 TARGET TOTAL DRAFT  =                 NOMINAL LAP SHEET WEIGHT
PRODUCTION PER SHIFT/ MACHINE
=          DELVERY SPEED/.9144*1/840*1/DEL.COUNT*1/ 2.204*8*60
=          98.4086/0.9144*1/840*1/0.0086844*1/2.204*8*60
=          3213.9728 KGs/shift/100 effy

No comments:

Post a Comment